Indulge in Life in America

Chapter 2059: Sewage plant makes money

In mid-April, Yang Cheng flew to London and Liverpool returned to the Champions League semi-finals. They will play against Juventus at home and away in early May. As long as they pass this hurdle, the Champions League trophy will be within easy reach.

At this time, as the team owner, it is natural to get closer to the team and sit in person.

But the reason why he flew here half a month earlier was because of Ian El's call.

This guy rushed to Beihai Manor early and waited for Yang Cheng to come back. He immediately said, "Boss, I think you should give me a bonus~"

Yang Cheng hasn't taken off his jacket yet, "What's your situation? Are you short of money?"

"No, I made a great investment for you~"

Yang Cheng can't laugh or cry, great?

"Tell me, how great is it?"

Ian Al put a stack of reports on the table, "I guess you didn’t pay attention to the two sewage treatment plants we bought from Jenkins last year. I just got back their first quarter report. It was a big surprise for me. The net income in the first quarter exceeded £200,000."

Yang Cheng couldn't bear to hit him. It only took him a few seconds to buy a Ferrari. Are you embarrassed to ask for a bonus of £200,000?

This Ian El is going to float.

Seeing that Yang Cheng's eyes were wrong, Ian El hurriedly said, "Boss, you forgot, our previous forecast, the net profit of a sewage treatment plant is 500,000 pounds a year, and now it has 200,000 in the first quarter. GBP."

Yang Cheng threw the coat to the maid and took a look at the accounts. Indeed, the profit in the first quarter exceeded 200,000 pounds, and the momentum remained good. If this continues, the net income for a year may be close to 1 million pounds. Forgot that this is only one family, but he bought two in one go, which is nearly 2 million?

What if there are 5 or 10? Yang Cheng took a breath. He didn't expect that the sewage treatment plant, which was acquired to accumulate a good reputation, could bring such a high return.

"What's the situation? Why did you suddenly earn so much?"

Ian Elle grinned, "Boss, this is also due to your identity, our sewage treatment plant, recently received one after another from the Z country inspection team."

"You mean, are we able to enter the country Z market? Luck will not be so good?"

"It's not that easy, but soon."

Yang Cheng pressed his temple, "Wait, I still don't understand, sewage treatment is really so profitable? This profit almost exceeds the garbage treatment plant."

"Hey~ Boss, it turns out that you and I underestimated this business."

When he and Yang Cheng sat down, they continued, "Several country Z inspection teams mainly learn about the treatment of sludge. The people of country Z are really generous, and they gave a sponsorship fee of £50,000 just for the inspection."

Yang Cheng smiled, "Speaking of business, leave the money alone."

"This is the money boss. Sludge is a solid waste produced in the process of sewage treatment. It produces a huge amount and has a complex composition. If it is not handled properly, it will not only cause new pollution to the environment, but also waste useful resources in the sludge. Sludge treatment and disposal is a severe challenge facing the drainage industry.

The sponsorship fee they gave was equivalent to tuition, and it was not at all a loss.

It should be understood that, compared to other developed European countries, the treatment and disposal of sludge in the UK started relatively late. In the early 1980s, the main method of disposal of sludge in the UK was ocean dumping and landfilling.

However, since the 1990s, the United Kingdom has done a lot of work in sludge management. The sludge treatment technology has been greatly developed, and the level of sludge treatment and disposal has reached the international advanced level.

The UK has its own uniqueness in the establishment of the sludge treatment and disposal management system, the design of technical routes, and the application of emerging technologies. This is a general patent. If I say that it is less than 50,000, it is at least 200,000. "

Yang Cheng darkened her face, "Talk about the important point~"

Ian Elle smirked, "As I said, in the early 1980s, the sewage treatment facilities in the UK were public facilities and were run by ZF.

At that time, the sludge contained high heavy metals, and the main disposal methods were ocean dumping and landfilling.

In the 1990s, as the number of sewage treatment facilities continued to increase, the sludge output increased sharply.

At the same time, sewage treatment facilities began to be privatized, and calls for the ban on ocean dumping of sludge continued to increase. Finally, ocean dumping of sludge was banned.

At the same time, due to the remarkable effect of source control, the quality of sludge is gradually improved, and the restriction of land use on sludge products is also reduced.

Therefore, in the late 1990s, land use gradually became the main method of sludge disposal in the UK. In order to ensure the safety of sludge land use, the UK prohibited the application of untreated sludge to the land, and the direct spread of sludge on the surface of the grass. And strictly control the sludge used for vegetable cultivation.

In the 21st century, landfill disposal of sludge was abolished in the UK.

With the popularization of modern sewage treatment facilities and the promotion of industrial wastewater pretreatment, the content of heavy metals and harmful substances in sludge has been greatly reduced, and sludge has begun to be regarded as a resource.

Obtaining energy from sludge is getting more and more attention, especially anaerobic digestion technology is widely used in the UK. More than 70% of sludge is anaerobic digested and then used for land use. When the sludge quality is poor or the land is recycled When the utilization is limited, incineration is also one of the main disposal methods. "

Yang Cheng interrupted him, "In other words, sludge treatment is also profitable?"

"Yes, there are actually quite a few similar revenue points."

"Then what's the situation in country Z? They want to introduce our technology? Or equipment?"

"No, no, it's just a small amount of money, I mean just invest in it~"

Yang Cheng frowned, "The national conditions are different. Now Z country sewage treatment is not privatized, right?"

Ian Aier smiled and said, "I did research and it is true that the domestic sewage treatment plant has the attribute of public utility. In theory, ZF should pay for the construction, operation and maintenance.

But in fact, whether it is due to financial constraints or lack of operating experience, ZF in the early days was always stingy in investing in the construction of new plants or the operating efficiency of the treatment plants that have already been put into operation was extremely low.

In this case, a large number of private enterprises began to enter and obtained franchise rights from ZF. The general operating period was 25-30 years. They paid ZF the first money to build the factory and were responsible after the treatment plant was completed and put into operation. Operation and maintenance, and all of this investment and income are recovered during the operating period through regular collection of treatment fees from ZF. This is the current profit model of the ZF sewage treatment plant.

In theory, the profit is around 30%. "

Yang Cheng was taken aback, "So high?"

"Yeah, I was shocked too, so I didn't expect to report to you."

Yang Cheng thought for a moment, "Go on~"

"In short, the sewage treatment project in Z country is basically divided into three modes: 1. ZF self-investment, self-construction and self-operation, and the income is public utility fund income;

2. Franchise business model: social capital purchases the franchise rights of the sewage treatment project and obtains the property rights of the sewage treatment plant, and the franchise expires and is transferred back to the ZF implementing agency or government designated agency;

3. PPP model, UU看书www.uukanshu.com One of the more typical ones is the construction of sewage treatment projects with social capital and implementation of operations. During the period, users will be paid to recover construction investment and obtain income.

Our goal is the third, and the second is the second best approach. "

Yang Orange nodded, "Sounds okay, but none of us have experience in operating in Country Z. Do you know how the process is? Going in with a black eye is easy to be pitted.

"I also studied. The basic process from civil construction to operation is very simple. ZF provides three connections and one leveling, providing the necessary water and electricity for the project;

Obtain the necessary procedures for starting construction, such as land certificate and construction permit;

Man-machine materials enter the site, the supervisor issues the construction permit, the construction starts, and the construction is carried out. The sewage pipe network is generally ZF construction;

Finally, purchase and install sewage treatment equipment, apply for ZF to provide sewage, and operate it, implement the completion acceptance, start operation, and collect treatment fees. The process is very simple. . . "

txt download address:

phone-reading:

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like