With the Great Desert Aerospace Industrial Zone, some factories of the first phase of the project officially started, that is, rocket R\u0026D and manufacturing, as well as aerospace aircraft R\u0026D, manufacturing and other factories officially started. Wang Bin and his Tiangong Technology have officially resumed. The production of these aspects has greatly increased, and he naturally hopes to obtain more and larger orders.

But for the current domestic, there are not many private private aerospace companies and the scale is not too large, so there will definitely not be too many aerospace planes worth one billion.

In other words, for the current Tiangong Technology, the most important orders come from the official aerospace companies and the military.

Therefore, Wang Bing would naturally take the suggestions put forward by Qin Lao and the others to heart.

So, just after the groundbreaking ceremony of the Great Desert Industrial Zone was over, after Mr. Qiu and the others left, Wang Shan and Professor Dai came to the R\u0026D area of ​​the Great Desert Industrial Zone and entered the aerospace aircraft design and development laboratory. .

"Mr. Wang, during this period of time, although our company's aerospace aircraft research and development and manufacturing departments have been relocated, our laboratory has not been idle during the period of relocation, and research on many projects has also been carried out It proceeded in an orderly manner.

Take our Phoenix-cz1 vertical take-off and landing aircraft as an example. We have developed an improved version during this period of time, and the new model of vertical take-off and landing Phoenix-1, the engine model used is no longer a turbofan engine .

Instead, a pulse detonation engine that is more similar to a rocket engine is used, so that it can be more suitable for using a rocket engine for vertical take-off and landing.

And according to our calculations, after using the pulse detonation engine, this vertical take-off and landing aircraft is far better than the previous Phoenix in terms of take-off weight, vertical take-off speed, maximum speed, and range. -cz1 vertical take-off and landing aircraft..."

Following Professor Dai's introduction, Wang Bin must have known about this vertical take-off and landing aircraft they developed in the past month, and at the same time, he still recognized this vertical take-off and landing aircraft, after all, no matter whether it was the previous -cz1 Type, or the current -cz1a type, for their Tiangong Technology, it is actually to better verify the vertical take-off and landing technology of aerospace aircraft. The Skyplane, which is the Phoenix II series of aerospace planes, will use the upper vertical take-off and landing technology.

Of course, because the weight of the Phoenix II series aircraft, especially the aerospace aircraft, will exceed 300 tons, even if their Tiangong Technology has verified the vertical take-off and landing technology, but such a heavy aerospace aircraft wants to carry out vertical take-off and landing on the earth. Take-off and landing are still temporarily unavailable.

The most important purpose of using the vertical take-off and landing technology on the second series of aerospace planes is not to allow them to perform vertical take-off and landing on the earth, but to enable the second series of aerospace planes to have Vertical take-off and landing is possible on planets whose gravitational force is far inferior to that of the earth, such as the moon, or Mars.

Of course, in the past month, Professor Dai's laboratory, apart from the achievements in this area, they have not relaxed in other projects.

For example, on larger aerospace planes, because Wang Bin provided them with some technologies before, the progress of research and development has been accelerated. Now the design of the aircraft in the atmosphere of the -2 aircraft is going very smoothly. According to estimates by Wang Bin and others, at most one or two more months,

Their designs are ready to go.

At that time, they will be able to design the aerospace aircraft according to the situation of the -2 aircraft in the atmosphere, and the time will not be too long. According to Wang Bin's estimation, it will take about one or two months at most to complete the design. Completion, that is to say at most -2 type aerospace plane, will take another three to four months to complete.

Of course, if the speed is fast enough, Tiangong Technology may have a Type-2 aerospace plane in less than three months. Even Wang Bin, as the boss of Tiangong Technology, is looking forward to it. .

"Professor Dai, since the design of the new Phoenix-cz1a aircraft is almost the same, we will immediately arrange production and conduct test flights, and try to complete the verification of vertical take-off and landing technology as soon as possible, and use it in our new aerospace aircraft. That is, on the Phoenix-2 series of aerospace planes." Wang Bin said.

"Mr. Wang, I have already arranged for the production. Even in many workshops here in the industrial park today, the parts produced are probably from this aircraft. If it goes well, it will take a week. Our This Fenghuang-cz1a vertical take-off and landing aircraft is ready for test flight." Professor Dai nodded and said.

"Very good! By the way. Professor Dai, a month ago, we recovered the various sections of the first 3,000-ton rocket here. How is the inspection going now? How is the manufacturing of the third-stage rocket? Can it be completed?" Wang Bin asked Professor Dai!

Because Mr. Qin and the others specifically asked about the Tiangong-9 rocket when they were leaving, and hoped that Tiangong Technology could prepare for the launch as soon as possible, because due to the official space station construction, time is very tight. After all, this But it's a nearly kiloton-class space station!

Relying solely on the official launch site and the official rockets is not enough at all. Even the components of many space stations are far more than 30 tons. The official rockets now have the largest carrying capacity. Such a heavy cabin is sent to space.

Therefore, these large and heavy cabins can only be completed by their Tiangong-9 of Tiangong Technology.

Of course, the official is also developing a rocket with a greater carrying capacity at this time, and its design is almost in progress, but because the rocket engine factory on Tiangong Technology has just resumed production, it is not yet possible for the official aerospace company A rocket engine that provides super-thrust, so although the official has designed a super-large rocket, it cannot be manufactured because there is no engine.

However, now that Tiangong Technology has resumed production of both rocket engines and Tiangong-9 rockets, the official space station can naturally proceed as planned.

"Mr. Wang! We have tested the first and second stages of Tiangong-9 recovered, and found no problems. As for the third stage rocket, we have also started manufacturing. According to the situation, if necessary, In about five days at most, we can launch!" Professor Dai replied.

"Very good! If that's the case! Then you immediately arrange personnel to reassemble the Tiangong-9 rocket. As for the cabin section to be carried by the rocket, Mr. Qin will arrange personnel to send it over in the next two days. After the installation is completed, immediately choose an opportunity Launch." Wang Bin said again.

"Okay! Mr. Wang!"

Please remember the first domain name of this book: . Mobile version reading website:

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like