Chaoshen Technology Trading Mall

Chapter 352 Tiangong Type 4 Rocket

"Attention crew, this aircraft is about to arrive at the No. 1 supply point, please prepare for the parachute drop of supplies! Repeat!...."

Following the captain's order, the crew immediately began to hang the materials to be parachuted on the rope and get ready.

Not long after, the back door of the cargo compartment of the plane was opened, and cold air poured in from the back of the plane's cabin. This made the personnel in the cabin, who were parachuting these supplies, fight a series of institutional cold wars, but fortunately, At that time, the personnel inside the warehouse had already done a good job of keeping warm, so there was no impact on the staff in the warehouse.

Soon the pilot of the plane saw a fire burning on the ground not far away, and it was obvious that their first mission had arrived!

So, he immediately flew in the direction of the fire, and made the people inside the warehouse ready. At the same time, he also slowly slowed down the speed of the plane, reaching the minimum flight speed of the plane.

When the plane finally arrived at the scheduled parachute location, he finally gave the order: "Start the airdrop!"

Following his life order, the crew members on the plane immediately delivered the materials that needed to be airdropped from the rear of the warehouse, box by box.

Soon, the airdrop at this location was completed. After all, all the airdrops at this location add up to only a dozen tons of supplies, and these supplies have already been packed in boxes, so there is no need for them to do anything more. Just put down all the supplies that need to be airdropped.

With the end of this airdrop, the hatch of the cargo warehouse was immediately closed. At the same time, the crew also returned to their seats and continued to fly to another place that needed supplies.

But the next place, there is no need for airborne, because the next place is 50 kilometers away from their location, and the terrain of this place is flat, so there is a suggested takeoff and landing runway.

Although the length of the runway is not long, only less than a thousand meters away, such a long runway is enough for this modified No. down ability.

Soon, the plane arrived at the next location, and successfully landed on the suggested runway at this location, and after putting down all the materials, it took off on this runway again, and then took off with the other two No. 8 transport planes. Convergence, return.

It can be said that although there was an accident when passing through the snow-capped mountains this time, the mission was successfully completed without any danger.

Of course, this mission also allowed the crew of the three No. 8 transport planes to have a clearer understanding of the performance of the aircraft, and they are also extremely satisfied with the modified No. 8 transport plane.

Not to mention other things, the old model No. 8 transport aircraft is far from comparable in terms of driving experience.

.........

Of course, Wang Bin is not very clear about these tasks. After all, the officials will not disclose these tasks to the public.

But one thing that makes Wang Bin excited is that with the official success of this mission. A large number of orders for high-power electric aero engines have come to Tiangong Technology. These orders include not only orders for helicopter electric engines, but also orders for fixed-wing aircraft electric engines.

At the same time, Tiangong Technology has also gained a lot in terms of orders for tg-s001 and 002 models.

In terms of electric engines alone, orders for all types of electric engines have reached thousands of sets, and this is only an order within a short period of time.

In addition, in terms of fuel engines, only the tg-s002 order, the official has added hundreds of units.

It can be said that at this time, Tiangong Technology has reached the limit of its production capacity. Even if the official continues to place orders, Tiangong Technology has been unable to complete it.

However, at this time, although Wang Bin still attaches great importance to the engine side, in the past few days, the project he focuses on is no longer the aero engine side, but puts his focus on the aerospace side. , or in the development of new rockets.

Since Tiangong Technology has successively developed the Tiangong-1 rocket with a carrying capacity of 0.5 tons, the -2 rocket with a carrying capacity of five tons and the -3 rocket with a carrying capacity of ten tons.

Therefore, the official aerospace department also attaches great importance to the aerospace company of Tiangong Technology, and in this short period of less than half a year, Wang Bin and his Tiangong Technology have launched many missions for the official, and all of them have been completed. The success gave the officials a clearer understanding of his Tiangong technology rocket.

However, Wang Bin and Tiangong Aerospace of Tiangong Technology are obviously not satisfied with this. At this time, the fourth rocket of Tiangong Technology has finally entered the final manufacturing process after the efforts of the personnel of Tiangong Aerospace. stage, and the carrying capacity and performance of this rocket are much stronger than those of the previous rockets. Its maximum earth orbit carrying capacity has reached about 15 tons, even if it is the carrying capacity of geosynchronous orbit. It reached as much as five tons.

It can be said that this rocket is very important to both Tiangong Technology and Huaxia officials.

Even in order to confirm the authenticity of the performance of this rocket, even Mr. Qin once again brought special aerospace experts to Tiangong Technology to confirm the performance, and confirmed that Tiangong Technology did not falsely report the carrying capacity and After the performance, the appropriate tasks were immediately arranged for Tiangong Technology.

However, due to the huge volume and weight of the rocket this time, according to the data, when the rocket is manufactured, its length will reach about 45 meters, and it will reach 5 meters directly. The most important thing is that the total weight of the entire rocket will reach nearly 800 tons, so transportation is not easy.

Therefore, for the first launch of this rocket, it will no longer be transported to the sea launch platform in the South China Sea for launch, but will be launched directly on the launch pad of Tiangong Technology.

However, due to the huge size and weight of this rocket, the official will also send a number of professional inspection and launch personnel to launch this rocket together with the employees of Tiangong Technology to ensure this launch. A large rocket can be launched successfully.

Of course, at the same time, they are also responsible for the mission goals of this launch, inspection and maintenance work before launch.

After all, the spacecraft that Tiangong Technology is going to launch this time is not an ordinary spacecraft, but a high-orbit communication satellite that is very important to the country.

And this communication satellite is not an ordinary military and civilian communication satellite, but a quantum communication satellite. Compared with the official quantum satellite before, this satellite is obviously more advanced, and its volume and tonnage are also more advanced. The huge size has basically reached the carrying limit of the newly developed Tiangong-4 rocket developed by Tiangong Technology.

Of course, it can also be seen from here how much the government attaches importance to Tiangong Technology.

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like