Wang Bin naturally didn't know what happened inside this factory. After all, as their company's tg-wsx2 engine passed the audit, the entire Tiangong Technology also began to focus on the trial production of this engine in terms of aero engines. and verification came up.

At the same time, in terms of turbojet engines, Wang Bin and the others did not give up on continuing research and development, and after the successful test run of the tg-002 turbojet engine, they started the research and development of a brand new turbojet engine.

However, what is different from before is that the nozzles of the two previous turbojet engines are only about 60 centimeters in diameter, but the newly developed turbojet engine has a diameter of 1.2 meters.

And this time they will no longer design a medium-sized turbojet engine, but a large-scale turbojet engine, that is, an engine with a nozzle diameter of more than one meter.

After all, Tiangong Technology will manufacture a large aircraft in the future, that is, the Phoenix aircraft, so in addition to using the turbofan engine, which is already trial-producing the prototype, that is, the tg-wsx2 engine, they must also Develop a turbojet version.

However, although Tiangong Technology already has tg-001 engines and tg-002 turbofan engines, since these turbojet engines are only medium-sized turbojet engines, if they are installed on large aircraft, the thrust of these engines is still somewhat insufficient .

Therefore, if the large aircraft of Tiangong Technology wants to meet or exceed the Mach 3 standard, then it will not be necessary to use a large turbojet engine for a long time. Of course, if a large ramjet engine can be used, it will be better for a long time. Compared with turbojet engines, ramjet engines are more efficient at high altitude and high speed.

But it is a pity that although Tiangong Technology has started research and development work on ramjet engines, Wang Bin has not provided any technology for the research and development of ramjet engines, so until now, they have not developed any Qualified ramjet.

At the same time, in fact, in terms of research and development of ramjet engines, the research and development enthusiasm of Professor Zha and others is not high at this time. After all, Tiangong Technology has now developed a turbojet engine, and its performance is also very good, even at high altitude and high speed. , compared with the ramjet engine, it is not bad at all. At the same time, in terms of economic benefits, the ramjet engine is far from being comparable to the turbojet engine they developed.

So their R\u0026D enthusiasm is naturally not high.

At the same time, there is another most important reason, that is, Tiangong Technology is now preparing to develop a turbojet engine with higher power and larger nozzle diameter.

The aerospace engine laboratory of Tiangong Technology is currently developing a detonation pulse engine that is superior to ramjet engines in terms of high-altitude and high-speed performance, and has also achieved considerable results in the development progress. The maximum nozzle diameter of the pulse engine has reached 20 centimeters, and at the same time, in terms of thrust, it can already reach about ten tons.

It is precisely because the research and development of the pulse engine has achieved considerable results that the R\u0026D personnel of Tiangong Technology are not active in the research and development of the ramjet engine. After all, these R\u0026D personnel are very busy now, and there is no extra time to develop the ramjet engine. .

Of course, this does not mean that Tiangong Technology does not have the strength to develop ramjet engines. After all, compared with turbofan and turbojet engines with more complex structures, the difficulty of developing ramjet engines is much lower.

The most difficult problem in the development of ramjet engines is actually the same as that of pulse engines, which are all in terms of high-temperature resistant materials.

Even in terms of material performance requirements, pulse engines have higher requirements, so since Tiangong Technology can develop pulse engines, they can naturally develop ramjet engines with lower material performance requirements.

In fact, don't talk about R\u0026D personnel, in fact, Wang Bin himself is not very interested in the research and development of ramjet engines. After all, compared with ramjet engines, the research and development of pulse engines is more difficult, but other The future use and research and development potential are definitely not comparable to ramjet engines.

Therefore, it is the most critical for Tiangong Technology to develop a usable pulse engine as soon as possible.

...................

Tiangong Shipyard, a subsidiary of Tiangong Technology, is the first brand-new power ship developed by Tiangong Technology after it was taken over by Tiangong Technology. After such a long period of construction, it is finally ready to launch.

That's right, this brand-new powered ship is an all-electric propulsion electric ship, and this all-electric propulsion ship is not an ordinary civilian ship, but a police ship, that is, a coast guard ship.

Although the tonnage of this coast guard ship is not large, only about 1,300 tons, and the construction period is not long, only less than a year, but for the first time to build an all-electric propulsion ship For the Tiangong ship of the ship, it took a lot of thought to build this coast guard ship.

Of course, since it is the first time to build an all-electric propulsion ship, there are naturally many difficulties encountered during the construction process, but these difficulties encountered during the construction process were eventually eliminated by the construction technicians of the shipyard and The designer of the ship solved them one by one.

Of course, like the all-electric propulsion technology that the government is experimenting with, the ship manufactured by Wang Bin and his shipyard also uses medium-voltage DC, which is more advanced than medium-voltage AC. After all, this ship is an official ship. , Naturally, the standard adopted must be the same as the official standard.

At this time, beside the shipbuilding platform that is about to be launched, the person in charge of the shipyard and the workers of the shipyard are waiting anxiously. It's been an hour.

But as the boss of Tiangong Technology, Wang Bin has not arrived yet.

You know, as early as a few days ago, the ship had been manufactured and Wang Bin, the boss of Tiangong Technology, had been notified. Having said that, as the owner of this shipyard, I hope that Wang Bin can participate in the launch of the first brand-new power-recommended ship of their shipyard.

At the same time, after he told Wang Bin about this matter, as the boss of Tiangong Technology, Wang Bin also agreed to come to participate in the launching ceremony.

Of course, for their Tiangong Ship Industry, the launch of this brand new recommendation system coast guard ship is not only Wang Bin and the people in their shipyard. In addition to Wang Bin himself and the people in the shipyard, they also invited The relevant departments of the city and provincial maritime police hope that they can send personnel to participate in the launching ceremony.

At the same time, the official leaders of the city were notified, and invitations were sent to them, hoping that they could also come to participate in the launching ceremony, and these people who were notified and invited by them basically came at this time.

Please remember the first domain name of this book: . Mobile version reading URL:

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like